Chitwan, July 11: Traffic along the Prithvi Highway, which was obstructed from 8:30 am this morning, has been resumed from 10:00 am today.
The traffic was obstructed along the highway after landslides occurred near Mugling Bazaar.
According to the Area Police Office, Mugling, the highway that was obstructed from 8:30 am resumed after around two hours.
The traffic resumed after landslides were removed by a dozer.
Vehicles stranded on the way are headed towards their destinations. RSS
The traffic was obstructed along the highway after landslides occurred near Mugling Bazaar.
According to the Area Police Office, Mugling, the highway that was obstructed from 8:30 am resumed after around two hours.
The traffic resumed after landslides were removed by a dozer.
Vehicles stranded on the way are headed towards their destinations. RSS